Complete fit-out of the new Gozo Channel premises covering all finishes: plastering, tiling, painting, joinery, aluminium apertures, fire-rated doors, and facade restoration.
The works also included full MEP installation: electrical, HVAC, plumbing, drainage, structured cabling, CCTV, fire detection, and intruder alarm systems.
Delivered on a six-month programme within an operational harbour environment.
